[{"data":1,"prerenderedAt":65},["ShallowReactive",2],{"blog-pcb-panel-x-out-management-en":3},{"title":4,"description":5,"date":6,"lastUpdated":6,"category":7,"image":8,"imageAlt":9,"readingTime":10,"wordCount":11,"timeRequired":12,"htmlContent":13,"faq":14,"tags":30,"slug":34,"sourceLocale":35,"availableLocales":36,"jsonld":41},"PCB Panel X-Outs: Acceptance and Assembly Control","Accept PCB panels with X-outs only under agreed limits, then verify board identification, assembly skips, traceability and usable-unit counts for the order.","2026-11-23","manufacturing",null,"",13,2568,"PT13M","\u003Cp>A PCB panel X-out is an individually rejected board position within a multi-board panel. Accepting that panel can be practical, but only if the buyer, fabricator and assembler agree on the permitted conditions and can prevent the rejected position from being treated as a good unit. The agreement should cover identification, orientation, production data, station-by-station handling, quantity reconciliation and commercial remedies.\u003C/p>\n\u003Cp>For broader panel design issues, see HILPCB’s \u003Ca href=\"/en/blog/panelization-design-guide-pcb-manufacturing-quality/\">panelization design guide\u003C/a>. The acceptance and assembly handoff for \u003Cstrong>individually rejected positions\u003C/strong> needs its own controls.\u003C/p>\n\u003Cp>The examples and acceptance rules below are hypothetical. They are not HILPCB specifications, promises of capability or universal X-out allowances.\u003C/p>\n\u003Ch2>What an X-out does—and does not—tell you\u003C/h2>\n\u003Cp>An X-out identifies a position that has been rejected or otherwise designated not to proceed as a good board under the agreed disposition. The visible mark does not necessarily explain the defect, its cause or whether it could be repaired.\u003C/p>\n\u003Cp>It also does not prove that neighboring positions passed their required inspection or electrical tests. An unmarked position should be counted as accepted only when the agreed test and disposition evidence supports that status.\u003C/p>\n\u003Cp>The distinction matters because three decisions are often mistakenly combined:\u003C/p>\n\u003Cul>\n\u003Cli>\u003Cstrong>Quotation:\u003C/strong> What quantity, panel condition, documentation and commercial terms are being offered?\u003C/li>\n\u003Cli>\u003Cstrong>Design and process planning:\u003C/strong> Can the panel, identification method and assembly workflow support the proposed handling?\u003C/li>\n\u003Cli>\u003Cstrong>Product qualification:\u003C/strong> What evidence is required to accept the boards and finished assemblies for the application?\u003C/li>\n\u003C/ul>\n\u003Cp>A quotation or panel drawing does not by itself qualify a product. Equally, an approved board design does not establish that a particular assembly line can detect and skip an X-out.\u003C/p>\n\u003Ch2>Choose the acceptance policy before fabrication\u003C/h2>\n\u003Cp>There is no universal permissible number or percentage of X-outs. Put the selected policy in the project documentation and purchase order, rather than relying on an informal expectation.\u003C/p>\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Policy\u003C/th>\n\u003Cth>Meaning for the order\u003C/th>\n\u003Cth>Questions to resolve\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>\u003Cstrong>No X-outs\u003C/strong>\u003C/td>\n\u003Ctd>Panels containing rejected positions are not accepted under the order unless an authorized deviation is approved.\u003C/td>\n\u003Ctd>What happens if the required usable quantity cannot be supplied as complete panels?\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>X-outs permitted within written limits\u003C/strong>\u003C/td>\n\u003Ctd>Rejected positions may be present if identification, distribution and other agreed conditions are met.\u003C/td>\n\u003Ctd>What are the limits per panel and per lot or shipment? Which denominators and rounding rules apply?\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Hold for deviation\u003C/strong>\u003C/td>\n\u003Ctd>A panel with an X-out is held until an authorized party decides its disposition.\u003C/td>\n\u003Ctd>Who receives the request, what evidence is required, and who can approve release?\u003C/td>\n\u003C/tr>\n\u003C/tbody>\u003C/table>\n\u003Cp>The per-panel limit and shipment-level limit answer different questions. A project might care about both the number of rejected positions concentrated in one panel and the number of affected panels in a shipment. The agreement should also address whether empty or missing positions are allowed and how partial panels are counted.\u003C/p>\n\u003Cp>If a panel exceeds the agreed allowance—or the mark, map or orientation is ambiguous—hold it for the agreed disposition. Do not silently count an uncertain position as good.\u003C/p>\n\u003Ch2>Specify physical identification and packaging\u003C/h2>\n\u003Cp>“Mark bad boards” is not a complete instruction. The fabrication drawing or controlled agreement should identify:\u003C/p>\n\u003Cul>\n\u003Cli>\u003Cstrong>Panel identification:\u003C/strong> How the panel is distinguished from other panels and linked to its records.\u003C/li>\n\u003Cli>\u003Cstrong>Position identification:\u003C/strong> The row and column or other naming convention for each board.\u003C/li>\n\u003Cli>\u003Cstrong>Mark location and appearance:\u003C/strong> Where a mark may be placed, its material or method, and the contrast needed for the intended inspection.\u003C/li>\n\u003Cli>\u003Cstrong>Visible sides:\u003C/strong> Whether identification is required on one side or both, considering flips and later handling.\u003C/li>\n\u003Cli>\u003Cstrong>Restrictions:\u003C/strong> Areas where a mark must not obscure required features, inspection evidence, labels or fiducials.\u003C/li>\n\u003Cli>\u003Cstrong>Packaging:\u003C/strong> Whether affected panels are segregated, labeled or accompanied by a separate count and map.\u003C/li>\n\u003C/ul>\n\u003Cp>These are fields to negotiate, not default manufacturing rules. A mark that an operator can see is not automatically suitable for a vision system, and a machine-readable mark should not be assumed readable after every process step.\u003C/p>\n\u003Cp>The panel drawing should also distinguish a bad-board mark from alignment features. The \u003Ca href=\"/en/blog/pcb-fiducial-marks/\">PCB fiducial marks guide\u003C/a> provides background on fiducials; whether a particular mark can be used by a particular machine must be verified for the project.\u003C/p>\n\u003Ch2>Define orientation before exchanging a panel map\u003C/h2>\n\u003Cp>A position label such as “A1” is useful only if everyone knows the viewing side, origin and numbering convention. The controlled drawing should define:\u003C/p>\n\u003Col>\n\u003Cli>The reference view and which side is facing the reader.\u003C/li>\n\u003Cli>The datum, row and column directions, and position labels.\u003C/li>\n\u003Cli>The panel identifier and any asymmetric orientation feature.\u003C/li>\n\u003Cli>The intended feed direction and any relevant rotations or flips.\u003C/li>\n\u003Cli>How each station translates the reference positions into its own coordinates.\u003C/li>\n\u003C/ol>\n\u003Cp>The data package should link each panel ID to its rejected positions and identify the map format, revision and owner. It should also say how a corrected map is issued and how obsolete versions are prevented from being used.\u003C/p>\n\u003Cp>\u003Ca href=\"https://www.the-hermes-standard.info/wp-content/uploads/IPC-HERMES-9852-Version-1.7.pdf\">IPC-HERMES-9852 version 1.7\u003C/a> describes optional subboard information and support signaling, including fields for position and state. The specification does not establish that a particular line supports those fields, uses the same side definitions or has been configured correctly. Confirm the implementation and data exchange on the actual line.\u003C/p>\n\u003Ch3>A hypothetical flip and coordinate mapping\u003C/h3>\n\u003Cp>The following is a \u003Cstrong>proposed test case\u003C/strong>, not a production result or acceptance specification.\u003C/p>\n\u003Cp>Suppose a six-position panel is viewed from the top. Rows are A and B from top to bottom; columns are 1 through 3 from left to right:\u003C/p>\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Top view\u003C/th>\n\u003Cth>Column 1\u003C/th>\n\u003Cth>Column 2\u003C/th>\n\u003Cth>Column 3\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>\u003Cstrong>Row A\u003C/strong>\u003C/td>\n\u003Ctd>\u003Cstrong>A1: rejected\u003C/strong>\u003C/td>\n\u003Ctd>A2\u003C/td>\n\u003Ctd>A3\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Row B\u003C/strong>\u003C/td>\n\u003Ctd>B1\u003C/td>\n\u003Ctd>B2\u003C/td>\n\u003Ctd>B3\u003C/td>\n\u003C/tr>\n\u003C/tbody>\u003C/table>\n\u003Cp>For this illustration, position centers are at x = 10, 30 and 50 mm, with row A at y = 10 mm and row B at y = 30 mm. The hypothetical panel is 60 mm wide. Coordinates increase to the right and downward in the drawing.\u003C/p>\n\u003Cp>Flip the panel about its \u003Cstrong>vertical centerline\u003C/strong>, then look directly at the bottom. In this hypothetical bottom view, rows and columns are freshly numbered from the upper left. The physical top-view \u003Cstrong>A1\u003C/strong> is now at bottom-view \u003Cstrong>A3\u003C/strong>:\u003C/p>\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Bottom view after the defined flip\u003C/th>\n\u003Cth>Column 1\u003C/th>\n\u003Cth>Column 2\u003C/th>\n\u003Cth>Column 3\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>\u003Cstrong>Row A\u003C/strong>\u003C/td>\n\u003Ctd>top A3\u003C/td>\n\u003Ctd>top A2\u003C/td>\n\u003Ctd>\u003Cstrong>top A1: rejected\u003C/strong>\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Row B\u003C/strong>\u003C/td>\n\u003Ctd>top B3\u003C/td>\n\u003Ctd>top B2\u003C/td>\n\u003Ctd>top B1\u003C/td>\n\u003C/tr>\n\u003C/tbody>\u003C/table>\n\u003Cp>For this convention, the center transforms as \u003Cstrong>x′ = 60 − x; y′ = y\u003C/strong>. Top A1 at \u003Ccode>(10, 10)\u003C/code> therefore appears at \u003Ccode>(50, 10)\u003C/code> in the bottom view. If a hypothetical placement program uses the same axis directions with an offset of \u003Ccode>(100, 200)\u003C/code>, its corresponding point would be \u003Ccode>(150, 210)\u003C/code>.\u003C/p>\n\u003Cp>That calculation is a mapping to verify, not evidence that a machine has been programmed correctly. Actual programs may use different axes, offsets, rotations, board origins or position labels. The assembly team should check the physical panel against the approved drawing and actual program on each applicable side.\u003C/p>\n\u003Ch2>Verify the skip on the actual production line\u003C/h2>\n\u003Cp>A physical mark, a manually entered skip and an electronic map are possible controls. They are not interchangeable guarantees. A documented method may describe mark recognition or transfer of bad-position information, but that description does not prove that a particular line has the necessary equipment, settings or interfaces enabled.\u003C/p>\n\u003Cp>A practical verification plan should identify the panel, line, program revision, map revision, operator and date. Before release, the responsible team should:\u003C/p>\n\u003Col>\n\u003Cli>\u003Cstrong>Match the inputs.\u003C/strong> Compare the physical mark, panel ID and position against the approved map and reference drawing.\u003C/li>\n\u003Cli>\u003Cstrong>Check orientation.\u003C/strong> Confirm the loaded side, feed direction, datum and any transformation used by the station.\u003C/li>\n\u003Cli>\u003Cstrong>Verify a rejected position.\u003C/strong> Demonstrate using the line’s approved safe method that the intended position is skipped.\u003C/li>\n\u003Cli>\u003Cstrong>Verify a good position.\u003C/strong> Check that at least an intended good position remains enabled and corresponds to the correct physical board.\u003C/li>\n\u003Cli>\u003Cstrong>Record the evidence.\u003C/strong> Retain the agreed program check, machine record, inspection record or other objective evidence.\u003C/li>\n\u003Cli>\u003Cstrong>Control changes and restarts.\u003C/strong> Define when verification must be repeated after a program, map, setup, equipment or orientation change, and after an interrupted run.\u003C/li>\n\u003C/ol>\n\u003Cp>The good-position check matters: a program that skips the wrong location can both process the rejected board and fail to process an acceptable one. A test that confirms only “a skip occurred” is therefore incomplete.\u003C/p>\n\u003Cp>If the physical mark conflicts with the map, or the machine view cannot be reconciled with the drawing, stop and hold the affected panel. The agreement should name who investigates, who can correct the data and who authorizes restart.\u003C/p>\n\u003Ch2>Control printing and later processing separately\u003C/h2>\n\u003Cp>A placement skip alone does \u003Cstrong>not\u003C/strong> establish that solder paste was not printed on the rejected position. Printing and placement may have separate controls; published equipment concepts illustrate that separation without establishing what any particular line will do.\u003C/p>\n\u003Cp>For each applicable operation, the process plan should state the intended treatment and the evidence used to verify it:\u003C/p>\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Operation\u003C/th>\n\u003Cth>Question for the project team\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>\u003Cstrong>Paste printing\u003C/strong>\u003C/td>\n\u003Ctd>Will paste reach the rejected position? If it does, what approved handling follows?\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Paste inspection\u003C/strong>\u003C/td>\n\u003Ctd>How is the rejected position identified, reported or excluded from the relevant inspection decision?\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Placement and reflow\u003C/strong>\u003C/td>\n\u003Ctd>Which components, if any, may be placed on the rejected position, and how is its status retained?\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Assembly inspection and test\u003C/strong>\u003C/td>\n\u003Ctd>How do programs and operators distinguish rejected positions from units awaiting inspection or test?\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Depaneling and final segregation\u003C/strong>\u003C/td>\n\u003Ctd>How is the rejected unit separated, controlled and prevented from entering finished-good inventory?\u003C/td>\n\u003C/tr>\n\u003C/tbody>\u003C/table>\n\u003Cp>The answers depend on the design, equipment and agreed process. Do not assume a downstream station receives an upstream skip status, and do not assume a previously visible mark survives or remains visible after a flip, processing or depaneling.\u003C/p>\n\u003Ch2>Reconcile good-unit quantity without mixing loss categories\u003C/h2>\n\u003Cp>Panel count is not the same as accepted board count. The reconciliation should separate fabrication rejects, held positions, later assembly losses and final accepted assemblies.\u003C/p>\n\u003Cp>\u003Cstrong>Fictional example:\u003C/strong> Four six-position panels contain \u003Cstrong>24 total positions\u003C/strong>. Two identified positions are rejected during fabrication. The other 22 have the required evidence and are accepted as bare boards. Later, one of those 22 becomes assembly scrap.\u003C/p>\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Stage\u003C/th>\n\u003Cth align=\"right\">Count\u003C/th>\n\u003Cth>Interpretation\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>Physical positions received\u003C/td>\n\u003Ctd align=\"right\">24\u003C/td>\n\u003Ctd>Four panels × six positions\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Fabrication X-outs\u003C/td>\n\u003Ctd align=\"right\">−2\u003C/td>\n\u003Ctd>Rejected before bare-board acceptance\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Accepted bare boards\u003C/td>\n\u003Ctd align=\"right\">22\u003C/td>\n\u003Ctd>Assuming required acceptance evidence is present\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Later assembly scrap\u003C/td>\n\u003Ctd align=\"right\">−1\u003C/td>\n\u003Ctd>A separate assembly loss, not another fabrication X-out\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Finished good assemblies\u003C/td>\n\u003Ctd align=\"right\">21\u003C/td>\n\u003Ctd>Assuming all remaining units meet final acceptance requirements\u003C/td>\n\u003C/tr>\n\u003C/tbody>\u003C/table>\n\u003Cp>If a panel or position is held, report it separately rather than counting it as accepted or automatically as scrap. Record the eventual disposition and adjust the appropriate category. A shortfall against an order for 22 finished good assemblies would need to be addressed under the agreed replacement, overage or other commercial terms.\u003C/p>\n\u003Cp>For larger orders, the same logic applies: \u003Cstrong>total positions minus fabrication rejects and unresolved holds\u003C/strong> gives a count available for bare-board acceptance, subject to the required evidence. It does not guarantee the same number of finished assemblies.\u003C/p>\n\u003Ch2>Preserve traceability through depaneling\u003C/h2>\n\u003Cp>At receiving, link the shipment and lot records to each affected panel ID, its map revision and the applicable inspection or test evidence. During assembly, retain the program and disposition records needed to explain which position was skipped and why.\u003C/p>\n\u003Cp>Before depaneling removes the panel context, establish how each separated unit will retain or acquire its identity and status. The traceability plan should cover:\u003C/p>\n\u003Cul>\n\u003Cli>The relationship between panel ID, position and individual unit ID, where used.\u003C/li>\n\u003Cli>The point at which a position changes from accepted, rejected or held to another controlled status.\u003C/li>\n\u003Cli>How rejected or held units are segregated from good inventory.\u003C/li>\n\u003Cli>How rework, scrap and final test results are linked back to the originating position.\u003C/li>\n\u003Cli>Who owns records and how long they are retained under the project agreement.\u003C/li>\n\u003C/ul>\n\u003Cp>A photograph may help resolve a position question, but it should not replace the agreed map, test record or disposition. If records disagree, retain the conflicting evidence and hold the affected material until an authorized decision is documented.\u003C/p>\n\u003Ch2>RFQ checklist: turn the policy into an order\u003C/h2>\n\u003Cp>Use a one-page X-out agreement and verification sheet with the RFQ, drawing package and purchase order. Leave limits blank until the parties agree; do not insert a presumed industry allowance.\u003C/p>\n\u003Cul>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Quantity basis:\u003C/strong> State the required number of accepted bare boards or finished assemblies, as applicable, and the requested delivery quantity.\u003C/li>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Acceptance policy:\u003C/strong> Specify no X-outs, written allowances or hold for deviation.\u003C/li>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Limits and distribution:\u003C/strong> Define per-panel and per-lot or shipment limits, denominators, rounding, missing positions and partial panels.\u003C/li>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Identification:\u003C/strong> Provide the panel ID, position convention, mark requirements, sides, packaging and segregation instructions.\u003C/li>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Orientation:\u003C/strong> Include the reference view, datum, feed direction and approved flip or rotation conventions.\u003C/li>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Production data:\u003C/strong> Define the panel-to-position map, format, revision control, delivery method and correction owner.\u003C/li>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Verification:\u003C/strong> Identify who compares physical marks, map and program; what skip and good-position evidence is required; and when revalidation is needed.\u003C/li>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Later operations:\u003C/strong> Define treatment at printing, inspection, test and depaneling, as applicable.\u003C/li>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Acceptance evidence:\u003C/strong> Request the agreed bare-board inspection, test and disposition records; do not rely on absence of a mark.\u003C/li>\n\u003Cli>\u003Cinput disabled=\"\" type=\"checkbox\"> \u003Cstrong>Commercial closure:\u003C/strong> Ask for the quotation basis, lead time, overage, shortfall handling, replacement or credit terms, and deviation authority.\u003C/li>\n\u003C/ul>\n\u003Cp>Submit the controlled \u003Ca href=\"/en/blog/cam-files/\">CAM files\u003C/a> and panel drawing with the request, and identify which documents take precedence if they conflict. For an assembly project, review the \u003Ca href=\"/en/products/pcb-assembly/\">PCB assembly service\u003C/a>, then use \u003Ca href=\"/en/quote/\">Request a quote\u003C/a> or \u003Ca href=\"/en/contact/\">contact HILPCB\u003C/a> to discuss the project-specific terms. Any pricing, lead time, X-out handling or data-transfer method must be confirmed in the resulting agreement; the agreement determines the terms for the order.\u003C/p>\n\u003Cdiv data-component=\"BlogQuickQuoteInline\">\u003C/div>\n\u003C!-- faq:start -->\n\u003Ch2>FAQ\u003C/h2>\n\u003Ch3>Are PCB panels with X-outs acceptable?\u003C/h3>\n\u003Cp>They can be, if the buyer, fabricator and assembler agree to accept them under defined conditions. A no-X-out policy is also a valid project requirement.\u003C/p>\n\u003Ch3>Does an X-out mark prove the other boards on the panel are good?\u003C/h3>\n\u003Cp>No. The remaining positions need the inspection, test and acceptance evidence specified for the order.\u003C/p>\n\u003Ch3>Can an assembly machine automatically skip an X-out?\u003C/h3>\n\u003Cp>Some implementations describe mark detection or transfer of rejected-position information. Whether a specific line can use either method—and has it configured correctly—must be verified on that line.\u003C/p>\n\u003Ch3>Does skipping placement also prevent paste printing?\u003C/h3>\n\u003Cp>Not necessarily. Printing and placement must be addressed separately in the process plan; a placement skip is not proof of printing behavior.\u003C/p>\n\u003Ch3>How should X-outs affect the ordered quantity?\u003C/h3>\n\u003Cp>Define whether the order is for panels, accepted bare boards or finished assemblies. Reconcile fabrication X-outs, held positions and subsequent assembly losses separately, then apply the agreed shortfall or replacement terms.\u003C/p>\n\u003C!-- faq:end -->\n\u003Csection class=\"related-links\" aria-label=\"Related\">\u003Ch3>Related links\u003C/h3>\u003Cul>\u003Cli>\u003Ca href=\"/en/blog/panelization-design-guide-pcb-manufacturing-quality/\">panelization design guide: 20 common manufacturing, assembly &amp; testing issues (with checklist)\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/blog/pcb-fiducial-marks/\">PCB Fiducial Marks: IPC-7351B Sizing, Global vs. Local Placement, and SMT Vision Rules\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/blog/cam-files/\">Understanding CAM Files for PCB Manufacturing\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/products/pcb-assembly/\">PCB assembly service\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/quote/\">Request a quote\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/contact/\">contact HILPCB\u003C/a>\u003C/li>\u003C/ul>\u003C/section>",[15,18,21,24,27],{"question":16,"answer":17,"answerText":17},"Are PCB panels with X-outs acceptable?","They can be, if the buyer, fabricator and assembler agree to accept them under defined conditions. A no-X-out policy is also a valid project requirement.",{"question":19,"answer":20,"answerText":20},"Does an X-out mark prove the other boards on the panel are good?","No. The remaining positions need the inspection, test and acceptance evidence specified for the order.",{"question":22,"answer":23,"answerText":23},"Can an assembly machine automatically skip an X-out?","Some implementations describe mark detection or transfer of rejected-position information. Whether a specific line can use either method—and has it configured correctly—must be verified on that line.",{"question":25,"answer":26,"answerText":26},"Does skipping placement also prevent paste printing?","Not necessarily. Printing and placement must be addressed separately in the process plan; a placement skip is not proof of printing behavior.",{"question":28,"answer":29,"answerText":29},"How should X-outs affect the ordered quantity?","Define whether the order is for panels, accepted bare boards or finished assemblies. Reconcile fabrication X-outs, held positions and subsequent assembly losses separately, then apply the agreed shortfall or replacement terms.",[31,32,33],"PCB panelization","X-outs","assembly","pcb-panel-x-out-management","en",[35,37,38,39,40],"de","cn","fr","ru",{"blog":42,"breadcrumb":51},{"@context":43,"@type":44,"headline":4,"description":5,"url":45,"datePublished":6,"dateModified":6,"timeRequired":12,"keywords":46,"articleSection":7,"author":47,"publisher":50},"https://schema.org","BlogPosting","https://hilpcb.com/en/blog/pcb-panel-x-out-management/","PCB panelization, X-outs, assembly",{"@type":48,"name":49},"Organization","HILPCB",{"@type":48,"name":49},{"@context":43,"@type":52,"itemListElement":53},"BreadcrumbList",[54,59,63],{"@type":55,"position":56,"name":57,"item":58},"ListItem",1,"Home","https://hilpcb.com/",{"@type":55,"position":60,"name":61,"item":62},2,"Blog","https://hilpcb.com/en/blog/",{"@type":55,"position":64,"name":34,"item":45},3,1795477951939]