[{"data":1,"prerenderedAt":65},["ShallowReactive",2],{"blog-pcba-component-receiving-inspection-en":3},{"title":4,"description":5,"date":6,"lastUpdated":6,"category":7,"image":8,"imageAlt":9,"readingTime":10,"wordCount":11,"timeRequired":12,"htmlContent":13,"faq":14,"tags":30,"slug":34,"sourceLocale":35,"availableLocales":36,"jsonld":41},"Electronic Component Receiving for PCB Assembly","Check component identity, source, condition and quantity at receipt; document exceptions, release decisions and traceability before PCB assembly kitting.","2026-11-26","assembly",null,"",16,3160,"PT16M","\u003Cp>\u003Cstrong>The receiving decision is whether a specific lot of components has enough evidence, under the project’s agreed requirements, to move into controlled storage and later kitting.\u003C/strong> If identity, source, condition, quantity or required verification is unresolved, keep the affected material on a documented hold until an authorized person decides what happens next.\u003C/p>\n\u003Cp>Receiving inspection reduces the risk of issuing the wrong, damaged or poorly documented material to assembly. It does not, by itself, prove that components are authentic, electrically fit or suitable for the design.\u003C/p>\n\u003Cp>The decision starts with inputs established before the shipment arrives. Review \u003Ca href=\"/en/blog/bom-error-checking-component-procurement/\">BOM and procurement checks\u003C/a> for part and source requirements, and \u003Ca href=\"/en/blog/pcb-component-substitution-approval/\">component substitution approval\u003C/a> for changes to a released design. For handling beyond the receiving decision, see \u003Ca href=\"/en/blog/moisture-sensitive-devices-msl-handling/\">moisture-sensitive device handling\u003C/a>. Quantity planning, including material needed for assembly operations, is addressed in \u003Ca href=\"/en/blog/pcb-assembly-component-overage/\">component overage\u003C/a>.\u003C/p>\n\u003Ch2>Start with the decision criteria, not the package label\u003C/h2>\n\u003Cp>A receiver needs a controlled reference against which to compare the shipment. Depending on the project, that reference may include:\u003C/p>\n\u003Cul>\n\u003Cli>The released BOM revision, manufacturer and complete manufacturer part number (MPN).\u003C/li>\n\u003Cli>The purchase order, expected quantity, packing list and required carrier or packaging.\u003C/li>\n\u003Cli>Approved alternatives, including the product, revision and quantity to which each approval applies.\u003C/li>\n\u003Cli>Source restrictions and required purchase or chain-of-custody documentation.\u003C/li>\n\u003Cli>Lot, date-code or handling restrictions when specified for the project.\u003C/li>\n\u003Cli>The inspection or test plan, acceptance criteria, record requirements and disposition authority.\u003C/li>\n\u003C/ul>\n\u003Cp>A distributor description or internal nickname may help find a record, but it is not necessarily enough to distinguish variants with different suffixes, grades, finishes or programmed states. If the controlled requirements are unclear, the receiver should ask for clarification rather than select a seemingly equivalent part.\u003C/p>\n\u003Cp>The same principle applies to customer-supplied material. The material owner and assembler should agree on what information accompanies it, what receiving checks are expected, and who decides whether incomplete history is acceptable.\u003C/p>\n\u003Ch2>Keep four receiving questions separate\u003C/h2>\n\u003Cp>A single “passed inspection” entry can hide different decisions. Record these questions separately enough that the next owner knows what was checked and what remains unresolved.\u003C/p>\n\u003Ch3>1. Identity: Is this the ordered part?\u003C/h3>\n\u003Cp>Compare the manufacturer and full MPN on the available records and packaging with the released requirement. Check the package, carrier and other controlled attributes, such as grade or programmed state, when relevant.\u003C/p>\n\u003Cp>Use manufacturer information for the actual part to interpret markings and packaging. A tiny component may have limited or no readable marking; a label or mark alone may not establish the complete part identity. A barcode match is useful for comparison only when the underlying data is correct and sufficient.\u003C/p>\n\u003Cp>A different MPN is not automatically acceptable because it looks similar or has comparable headline specifications. \u003Cstrong>Receiving can identify a proposed substitution; the designated design owner must approve its use.\u003C/strong>\u003C/p>\n\u003Ch3>2. Source and pedigree: Is the history acceptable?\u003C/h3>\n\u003Cp>Compare the shipment and supporting records with the project’s approved source and traceability requirements. Depending on the agreement, evidence might include purchase documentation, supplier identification, manufacturer lot information or certificates.\u003C/p>\n\u003Cp>Receiving does not automatically approve a new supplier or resolve a suspect chain of custody. Missing, inconsistent or unexpected records call for the appropriate procurement and quality review. A certificate or label is evidence to review, not self-validating proof of authenticity.\u003C/p>\n\u003Cp>A suspected counterfeit issue may require a separate investigation and a risk-specific plan. Routine receiving should preserve the material and records for that decision, not present itself as a complete counterfeit investigation.\u003C/p>\n\u003Ch3>3. Condition: Can the material proceed under the handling rules?\u003C/h3>\n\u003Cp>Check the external packaging and visible carrier condition against the order and applicable instructions. Relevant observations can include damaged reels or trays, disturbed seals, contamination, legibility of labels and visible damage to exposed parts.\u003C/p>\n\u003Cp>Condition includes handling history as well as appearance. A clean-looking package does not establish that moisture, electrostatic discharge (ESD) or other exposure has been controlled. Unknown history should be identified as unknown, not inferred from appearance.\u003C/p>\n\u003Ch3>4. Performance: Is additional verification required?\u003C/h3>\n\u003Cp>The project’s risk plan may call for measurement or other testing before release. Select the method for the component, the concern and the decision it must support. For example, a measurement on a suitable passive component may help identify an unexpected value, but it does not establish its full MPN, source or performance under every condition.\u003C/p>\n\u003Cp>Sampling, visual inspection, labels, records and measurements can each contribute evidence. \u003Cstrong>None alone proves authenticity or fitness for the intended application\u003C/strong>, and a sample result does not necessarily describe every item in a lot. The applicable agreement and controlled plan define the sample, method, criteria and meaning of the result.\u003C/p>\n\u003Ch2>Receive and preserve the lot\u003C/h2>\n\u003Cp>A practical receiving sequence begins by identifying the shipment and keeping it controlled while the required checks are completed. The exact workflow depends on the project and site procedures; the following is a decision framework, not a universal operating procedure.\u003C/p>\n\u003Col>\n\u003Cli>\u003Cstrong>Identify the receipt.\u003C/strong> Associate it with the relevant order, customer-supplied-material record or other project reference.\u003C/li>\n\u003Cli>\u003Cstrong>Retain the lot identity.\u003C/strong> Preserve manufacturer and supplier identifiers available on the original packaging, and assign or retain a receiving-lot reference as the controlled procedure requires.\u003C/li>\n\u003Cli>\u003Cstrong>Compare the records.\u003C/strong> Check the part, source documentation, quantity and packaging against the released requirements.\u003C/li>\n\u003Cli>\u003Cstrong>Review condition and handling information.\u003C/strong> Record visible exceptions without unnecessarily disturbing protective packaging.\u003C/li>\n\u003Cli>\u003Cstrong>Apply the approved inspection or test plan.\u003C/strong> Record what was examined or measured, the method and the result.\u003C/li>\n\u003Cli>\u003Cstrong>Route exceptions for disposition.\u003C/strong> Do not combine questionable material with accepted stock while the decision is pending.\u003C/li>\n\u003Cli>\u003Cstrong>Transfer the authorized status and records.\u003C/strong> Storage and kitting need to know both what may be used and what restrictions remain.\u003C/li>\n\u003C/ol>\n\u003Cp>Where protective or moisture-barrier packaging is involved, do not assume it must be opened for routine external inspection. Open or transfer material only when the approved process requires it and the appropriate handling controls are available.\u003C/p>\n\u003Ch3>Quantity is a reconciliation decision\u003C/h3>\n\u003Cp>Choose a quantity-verification method appropriate to the material, packaging and required confidence. A supplier’s stated quantity, a physical count and an estimate can have different uncertainties. Record the basis of the figure rather than implying that every method is an exact count.\u003C/p>\n\u003Cp>\u003Cstrong>Hypothetical example:\u003C/strong> An order calls for \u003Cstrong>120 components\u003C/strong>. The receiving team records \u003Cstrong>112 received\u003C/strong>, leaving \u003Cstrong>8 unaccounted for\u003C/strong>:\u003C/p>\n\u003Cblockquote>\n\u003Cp>120 ordered − 112 received = 8 to reconcile\u003C/p>\n\u003C/blockquote>\n\u003Cp>The receiver records the difference and asks the responsible purchasing or material owner to reconcile it with the supplier and shipment records. The eight might be outstanding or the records might need correction; the example does not establish the cause. The status of the 112 depends on the project’s other receiving requirements and the authorized decision. Eight is \u003Cstrong>not\u003C/strong> a defect count, an acceptance rate or a sampling result.\u003C/p>\n\u003Ch3>Example: hand off a partial receipt with an exception\u003C/h3>\n\u003Cp>Assume the 112 received parts above are in two separately identifiable packages: package A contains 80 and package B contains 32. The receiving team finds the outer seal of B damaged; A has no visible exception. Both packages remain blocked while the required checks are incomplete. The record links each package, its quantity and available lot identifiers to the order, records the damaged seal as an observation, and notes the location and system hold status. The eight unaccounted-for parts remain a purchasing reconciliation item, not a third inspected package.\u003C/p>\n\u003Cp>Suppose the agreed procedure allows the packages to be assessed separately, and the authorized quality role completes all required checks for A. That role can document release of A&#39;s 80 parts for controlled storage, while B&#39;s 32 remain physically segregated and electronically blocked pending assessment. If the procedure requires a shipment-wide hold, or the scope of the damage is uncertain, A remains blocked too. Purchasing resolves the missing quantity with the supplier; a designated authority decides B&#39;s disposition using the applicable requirements and evidence.\u003C/p>\n\u003Cp>The example does not establish that a damaged seal makes the parts defective, or that a clean package proves they are suitable. Any split release needs an identified scope, completed checks, the relevant authority and an updated record; it does not authorize an unapproved substitution or erase the exception.\u003C/p>\n\u003Ch3>Example discrepancy record\u003C/h3>\n\u003Cp>The following fictional record shows the information a receiving team could hand to the person responsible for disposition. Adapt the fields to the project agreement and site procedure; this is not a claim about a standard report supplied with an order.\u003C/p>\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Field\u003C/th>\n\u003Cth>Example entry\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>Order and requirement\u003C/td>\n\u003Ctd>PO-EXAMPLE-01; released BOM revision B; 120 units ordered\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Manufacturer and MPN\u003C/td>\n\u003Ctd>Example manufacturer; \u003Ccode>EXAMPLE-MPN-01\u003C/code>; compare full code and suffix with the released BOM\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Receipt and identifiers\u003C/td>\n\u003Ctd>112 units recorded: package A, 80; package B, 32. Record each available manufacturer lot and package identifier.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Observation and scope\u003C/td>\n\u003Ctd>Package B outer seal visibly damaged; 32 units in B held pending assessment. Photograph and retain the package; do not infer component damage from the seal alone.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Quantity exception\u003C/td>\n\u003Ctd>Eight units unaccounted for; purchasing to reconcile against shipping and supplier records.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Location and system status\u003C/td>\n\u003Ctd>B: identified hold location and blocked inventory status. A: released for controlled storage only after all required checks and authorization, if the procedure permits a split release.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Owner and decision\u003C/td>\n\u003Ctd>Receiving records the observation; quality assesses B; purchasing follows up the shortage. The designated authority records the decision, affected quantity, date, restrictions and release or other disposition.\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>Evidence and handoff\u003C/td>\n\u003Ctd>Attach the receipt, labels, photographs, checks and signed decision as required. Transfer the approved status and applicable lot and handling information to storage and kitting.\u003C/td>\n\u003C/tr>\n\u003C/tbody>\u003C/table>\n\u003Cp>Until the authority records a decision for B, its disposition remains \u003Cstrong>pending\u003C/strong>. If the procedure requires a shipment-wide hold or the affected scope is uncertain, keep A blocked as well.\u003C/p>\n\u003Ch2>Record discrepancies so someone can act\u003C/h2>\n\u003Cp>A discrepancy record should allow another person to understand the issue without relying on a verbal handoff. Include, as applicable:\u003C/p>\n\u003Cul>\n\u003Cli>Order, project and released requirement or revision.\u003C/li>\n\u003Cli>Manufacturer, complete MPN, supplier and available lot or package identifiers.\u003C/li>\n\u003Cli>Affected quantity and the packages or splits involved.\u003C/li>\n\u003Cli>What was expected, what was observed and how it was checked.\u003C/li>\n\u003Cli>Relevant labels, documents, photographs or measurement records.\u003C/li>\n\u003Cli>The physical location and electronic status of the affected material.\u003C/li>\n\u003Cli>The person responsible for investigation, the decision authority and the final disposition.\u003C/li>\n\u003C/ul>\n\u003Cp>Record observations distinctly from conclusions. “Outer seal visibly damaged” is an observation; “parts are defective” may require an assessment. Similarly, an unreadable label is a traceability problem to resolve, not proof that the parts are counterfeit.\u003C/p>\n\u003Cp>If an issue might affect other packages or lots, the responsible quality and procurement roles should determine the scope of the hold. Do not assume that a problem in one package automatically applies—or does not apply—to every item in the shipment.\u003C/p>\n\u003Ch2>Use a status, trigger, owner and evidence matrix\u003C/h2>\n\u003Cp>The following matrix is an example for agreeing responsibilities. Role names and status labels must be adapted to the project’s quality agreement and controlled procedures.\u003C/p>\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Status\u003C/th>\n\u003Cth>Typical trigger\u003C/th>\n\u003Cth>Responsible owner\u003C/th>\n\u003Cth>Evidence or handoff needed\u003C/th>\n\u003C/tr>\n\u003C/thead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>\u003Cstrong>Received, unreviewed\u003C/strong>\u003C/td>\n\u003Ctd>Shipment identified but required checks are incomplete\u003C/td>\n\u003Ctd>Receiving\u003C/td>\n\u003Ctd>Order reference, receipt details, lot identifiers and controlled location; material remains blocked from issue\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Released for controlled storage\u003C/strong>\u003C/td>\n\u003Ctd>Required receiving checks and any specified verification are complete\u003C/td>\n\u003Ctd>Authorized release role designated by the agreement\u003C/td>\n\u003Ctd>Requirements and results, lot and quantity, release identity and date, handling restrictions\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Hold / investigation\u003C/strong>\u003C/td>\n\u003Ctd>MPN mismatch, missing source record, damage, quantity discrepancy or unknown handling history\u003C/td>\n\u003Ctd>Receiving records the issue; designated quality or procurement owner coordinates review\u003C/td>\n\u003Ctd>Discrepancy record, affected scope, physical location, electronic block and supporting evidence\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Return or other disposition pending\u003C/strong>\u003C/td>\n\u003Ctd>Authorized decision requires material to be returned or otherwise removed from normal use\u003C/td>\n\u003Ctd>Designated disposition owner, with purchasing or material owner as applicable\u003C/td>\n\u003Ctd>Written decision, affected quantity, return instructions or other approved disposition, continued controls until completed\u003C/td>\n\u003C/tr>\n\u003Ctr>\n\u003Ctd>\u003Cstrong>Deviation accepted for a defined scope\u003C/strong>\u003C/td>\n\u003Ctd>An authorized party permits a specified departure from a requirement\u003C/td>\n\u003Ctd>Authority named in the project quality agreement; design owner/customer when required\u003C/td>\n\u003Ctd>Written deviation, reason, approved lot, quantity, project or revision, restrictions and release authorization\u003C/td>\n\u003C/tr>\n\u003C/tbody>\u003C/table>\n\u003Cp>A deviation is not a rewrite of the BOM, proof of authenticity or blanket permission to use future deliveries. If the issue changes the design, substitution approval remains a separate decision.\u003C/p>\n\u003Ch2>Holds require both physical and electronic control\u003C/h2>\n\u003Cp>A documented hold should prevent affected material from being issued inadvertently while preserving the evidence needed to decide its disposition.\u003C/p>\n\u003Cp>\u003Cstrong>Physical control\u003C/strong> may mean a designated segregated location or other clearly identified arrangement under the site procedure. \u003Cstrong>Electronic control\u003C/strong> means the inventory or work-order records should show a blocked status so the material is not presented as available for picking. Either control on its own can leave a gap: a system block cannot stop an uncontrolled physical pick, and a separate shelf does not prevent an incorrect system issue.\u003C/p>\n\u003Cp>The record should identify the held quantity, original labels and documents, location, reason and responsible owner. Preserve samples and packaging as instructed; do not perform destructive testing, discard material or return it merely because an issue was recorded. Those actions require authority under the agreement.\u003C/p>\n\u003Cp>After review, an authorized person can release material, approve a scoped deviation, arrange a return or direct another disposition permitted by the project. Record the decision and update both the physical and electronic controls. Release from hold means the specified receiving decision has been made; it does not erase the discrepancy history or guarantee zero latent defects.\u003C/p>\n\u003Ch2>Handle moisture and ESD information without inventing limits\u003C/h2>\n\u003Cp>Moisture and ESD are different controls. A moisture-barrier bag is not automatically proof of ESD protection, and ESD packaging does not establish acceptable moisture exposure.\u003C/p>\n\u003Cp>At receipt, use the actual component and packaging information to identify applicable handling requirements. Record relevant label and seal condition, known prior openings and available exposure history. If the instructions call for humidity-indicator or desiccant information, review it under the applicable procedure; do not assume that a bag’s appearance alone proves the internal moisture condition.\u003C/p>\n\u003Cp>If exposure history is missing or inconsistent, hold the affected material for assessment before relevant heat exposure. Any recovery handling must follow current manufacturer part-specific instructions and the applicable controlled procedure, including the limits of the component and its carrier. Receiving should not invent a bake recipe, storage limit or floor-life allowance.\u003C/p>\n\u003Ch2>Hand off to storage and kitting without losing identity\u003C/h2>\n\u003Cp>Release is a transition, not the end of traceability. Storage needs the authorized status, correct location, lot identity and any packaging or handling restrictions. Keep original manufacturer labels with the material where practicable and follow the controlled procedure if a package must be relabeled or split.\u003C/p>\n\u003Cp>When material moves into a kit, retain the link between the issued quantity, its receiving or manufacturer lot, the package or split, and the work order. The required level of board-level traceability depends on the project agreement. Record movements and remaining quantities so that a later discrepancy can be traced back to the affected material.\u003C/p>\n\u003Cp>For moisture-sensitive components, hand off the \u003Cstrong>known handling state\u003C/strong>, not just the reel or tray. Where applicable, that includes opening and exposure information, relevant storage or repack records, and whether the history is unknown. A new bag or label should not be treated as automatically resetting exposure.\u003C/p>\n\u003Cp>Kitting and subsequent \u003Ca href=\"/en/blog/smt-component-feeder-setup-traceability/\">feeder setup and traceability\u003C/a> have their own checks. A correct receiving release does not prove that the right package was later issued to the right work order or installed at the right machine position. Conversely, feeder setup is not a substitute for resolving an incoming discrepancy.\u003C/p>\n\u003Ch2>RFQ and release checklist: agree who does what\u003C/h2>\n\u003Cp>Use the \u003Ca href=\"/en/quote/\">quote request\u003C/a> to define project-specific receiving expectations before material arrives. The checklist below assigns decisions to roles; it does not assume a particular service, test capability or record package is included. To discuss the project or clarify an open question, \u003Ca href=\"/en/contact/\">contact HILPCB\u003C/a>.\u003C/p>\n\u003Cdiv data-component=\"BlogQuickQuoteInline\">\u003C/div>\n\n\u003Ch3>At RFQ or order review\u003C/h3>\n\u003Cul>\n\u003Cli>\u003Cstrong>Customer or design owner:\u003C/strong> Supply the released BOM revision, exact manufacturer and MPN, approved alternatives and any restrictions on grade, programming or package.\u003C/li>\n\u003Cli>\u003Cstrong>Customer and procurement:\u003C/strong> Identify who supplies the components, acceptable sources and required source or traceability records.\u003C/li>\n\u003Cli>\u003Cstrong>Customer and quality representatives:\u003C/strong> Agree on lot definition, inspection or test plan, acceptance criteria, records, exception notification and release authority.\u003C/li>\n\u003Cli>\u003Cstrong>Material owner and assembler:\u003C/strong> Define handling and return responsibilities for customer-supplied material, including unknown history, excess and remnants.\u003C/li>\n\u003Cli>\u003Cstrong>Parties authorizing additional testing:\u003C/strong> Agree in advance on the method, sample ownership, destructive consumption if any, cost, reporting and who can approve the work.\u003C/li>\n\u003C/ul>\n\u003Ch3>Before release to storage or kitting\u003C/h3>\n\u003Cul>\n\u003Cli>\u003Cstrong>Receiving:\u003C/strong> Record the actual part, lot, quantity, condition, checks performed and any discrepancy.\u003C/li>\n\u003Cli>\u003Cstrong>Procurement or material owner:\u003C/strong> Reconcile order, source and quantity questions and coordinate supplier responses where needed.\u003C/li>\n\u003Cli>\u003Cstrong>Quality or other designated authority:\u003C/strong> Document the disposition and authorize release, return or a scoped deviation.\u003C/li>\n\u003Cli>\u003Cstrong>Design owner/customer, when required:\u003C/strong> Approve a substitution or other change affecting the released design.\u003C/li>\n\u003Cli>\u003Cstrong>Storage and kitting:\u003C/strong> Receive the status, lot-to-work-order information, quantity and applicable handling state; keep held material unavailable for issue.\u003C/li>\n\u003C/ul>\n\u003Cp>The agreement should also identify what evidence will be retained and shared. Requesting a report is not the same as establishing that a particular test was performed or that a record is available.\u003C/p>\n\u003C!-- faq:start -->\n\n\u003Ch2>FAQ\u003C/h2>\n\u003Ch3>Does incoming inspection prove components are genuine?\u003C/h3>\n\u003Cp>No. Labels, visual checks, source records and selected tests can contribute evidence, but none alone proves authenticity. Suspect material should be handled under the project’s investigation and disposition process.\u003C/p>\n\u003Ch3>Can receiving approve a different component if the ordered part is unavailable?\u003C/h3>\n\u003Cp>Receiving can flag the mismatch, but substitution requires approval from the designated design authority. The approval should define the applicable part, project or revision and other limits before use.\u003C/p>\n\u003Ch3>Should every sealed component package be opened at receipt?\u003C/h3>\n\u003Cp>No universal rule requires opening every package. Review available external information first and open protective packaging only when the approved inspection or handling process requires it.\u003C/p>\n\u003Ch3>What happens when the received quantity is short?\u003C/h3>\n\u003Cp>Record the expected and received quantities, identify the unaccounted balance and ask the responsible purchasing or material owner to reconcile it. Whether the received portion can proceed depends on the other requirements and the authorized disposition.\u003C/p>\n\u003Ch3>What must follow an accepted lot into kitting?\u003C/h3>\n\u003Cp>At minimum, transfer the authorized status and the traceability and handling information required by the project. Preserve links among the lot, relevant packages or splits, quantities and work order, along with any applicable moisture-exposure history.\u003C/p>\n\u003C!-- faq:end -->\n\u003Csection class=\"related-links\" aria-label=\"Related\">\u003Ch3>Related links\u003C/h3>\u003Cul>\u003Cli>\u003Ca href=\"/en/blog/bom-error-checking-component-procurement/\">BOM error checking for component procurement: MPN matching, aliases, and lifecycle triage\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/blog/pcb-component-substitution-approval/\">PCB Component Substitution: An Approval Checklist\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/blog/moisture-sensitive-devices-msl-handling/\">Moisture-Sensitive Devices: MSL and Floor-Life Control\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/blog/pcb-assembly-component-overage/\">PCB Assembly Component Overage: How to Plan Consigned Parts\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/blog/smt-component-feeder-setup-traceability/\">SMT Feeder Setup Verification and Traceability\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/quote/\">quote request\u003C/a>\u003C/li>\u003Cli>\u003Ca href=\"/en/contact/\">contact HILPCB\u003C/a>\u003C/li>\u003C/ul>\u003C/section>",[15,18,21,24,27],{"question":16,"answer":17,"answerText":17},"Does incoming inspection prove components are genuine?","No. Labels, visual checks, source records and selected tests can contribute evidence, but none alone proves authenticity. Suspect material should be handled under the project’s investigation and disposition process.",{"question":19,"answer":20,"answerText":20},"Can receiving approve a different component if the ordered part is unavailable?","Receiving can flag the mismatch, but substitution requires approval from the designated design authority. The approval should define the applicable part, project or revision and other limits before use.",{"question":22,"answer":23,"answerText":23},"Should every sealed component package be opened at receipt?","No universal rule requires opening every package. Review available external information first and open protective packaging only when the approved inspection or handling process requires it.",{"question":25,"answer":26,"answerText":26},"What happens when the received quantity is short?","Record the expected and received quantities, identify the unaccounted balance and ask the responsible purchasing or material owner to reconcile it. Whether the received portion can proceed depends on the other requirements and the authorized disposition.",{"question":28,"answer":29,"answerText":29},"What must follow an accepted lot into kitting?","At minimum, transfer the authorized status and the traceability and handling information required by the project. Preserve links among the lot, relevant packages or splits, quantities and work order, along with any applicable moisture-exposure history.",[31,32,33],"component receiving","incoming inspection","PCB assembly","pcba-component-receiving-inspection","en",[35,37,38,39,40],"de","cn","fr","ru",{"blog":42,"breadcrumb":51},{"@context":43,"@type":44,"headline":4,"description":5,"url":45,"datePublished":6,"dateModified":6,"timeRequired":12,"keywords":46,"articleSection":7,"author":47,"publisher":50},"https://schema.org","BlogPosting","https://hilpcb.com/en/blog/pcba-component-receiving-inspection/","component receiving, incoming inspection, PCB assembly",{"@type":48,"name":49},"Organization","HILPCB",{"@type":48,"name":49},{"@context":43,"@type":52,"itemListElement":53},"BreadcrumbList",[54,59,63],{"@type":55,"position":56,"name":57,"item":58},"ListItem",1,"Home","https://hilpcb.com/",{"@type":55,"position":60,"name":61,"item":62},2,"Blog","https://hilpcb.com/en/blog/",{"@type":55,"position":64,"name":34,"item":45},3,1795625460767]