06 ยท Prototype RFQ Checklist
Prototype RFQ Checklist
Send the items below to keep the review and lead time on the first pass. Anything missing will be flagged in the quotation, not assumed at order time.
RequiredGerber or ODB++ files
!fabrication data, drill, and board outline. Missing: cannot quote or verify panelization
โUse TBD when unsure. We will confirm details before quoting.
RequiredNC drill files
!drill sizes, positions, and plating requirements. Missing: cannot program drilling or verify via design
โUse TBD when unsure. We will confirm details before quoting.
RequiredFabrication drawing
!stackup, layer order, controlled impedance notes, finish, and special process requirements. Missing: stackup and impedance cannot be verified
โUse TBD when unsure. We will confirm details before quoting.
RequiredMaterial specification
!grade, Tg, copper weight, thickness, and dielectric requirements. Missing: cannot confirm material availability or 24h eligibility
โUse TBD when unsure. We will confirm details before quoting.
RequiredControlled impedance table
!target impedance, trace width, layer reference, and tolerance. Missing: cannot configure impedance coupon testing
โUse TBD when unsure. We will confirm details before quoting.
RequiredTest requirements
!electrical test method, IPC class, and acceptance criteria. Missing: test plan defaults to standard flying probe
โUse TBD when unsure. We will confirm details before quoting.
RequiredQuantity and delivery target
!prototype or NPI volume with target date. Missing: cannot allocate line time or confirm 24h eligibility
โUse TBD when unsure. We will confirm details before quoting.